Lick Creek Drainage Masterplan Study
The Lick Creek study area roughly corresponds to the Midtown Memphis area bounded by Jackson Avenue/Vollintine Avenue on the north, Hollywood Street/Alicia Drive on the east, the Cooper-Young neighborhood on the south, and Belvedere Boulevard/Cleveland Street/Stonewall Street on the west. It was the first comprehensive drainage masterplan study completed by the City and serves as a “pilot project.” to demonstrate the effectiveness at examining flooding solutions on a watershed-wide level. Since the study’s completion in 2006, several improvements have been constructed, which have reduced the risk of flooding within the study area.
Study Completion Date: 2006 (updated 2011-2012)
Completed Projects:
- Above ground detention facility at Christian Brothers University’s soccer field (2010)
- Below ground detention facility under the Overton Square Parking Garage (2013)
- Above ground detention facility at Snowden School (2014)
- Above ground detention facility at Memphis Catholic High School (2015)
- Detention basin at Peabody Elementary School