Skip to Content Skip to Content

Days Creek Drainage Masterplan Study

Days Creek Drainage Masterplan Study

The Days Creek study area includes much of the Whitehaven neighborhood. The Tennessee portion of the watershed roughly corresponds to the area bounded by Nonconnah Creek on the north, the western portion of Memphis International Airport on the east, the Mississippi State Line on the south, and a diagonal line from Elvis Presley Boulevard/Shelby drive to Winchester Road/Mill Branch Road on the west. (click here for an interactive map)

Study Completed: 2020
Completed Projects:

  • Drainage Improvements at Oakwood and Ridgewood

Planned Projects:

  • Santa Clara Drive Detention